So far, this is what I have achieved (and not) as
of 21/11/15 :
Objectives:
- Technical objectives – yes;
- Planned response from client and audience – not yet
Target audiences:
- Suitability – conservative images (like in Checkpoint C) for a broader markets; radical ones for more 'niche' markets
- Reaction – none yet.
Time line/schedule
I hope to finish this project,
Checkpoint D (written out, uploaded/shared) by tomorrow. I am now up
to this final Project Challenge, so I think I'm doing okay.
Development (milestone) stages
Except for my thumbnails (which I
skipped) and getting feedback, I have achieved most of these.
Description of the style, look and creative direction of the piece
Hopefully 'yes' – I think my
Hammerhead t-shirt looks pretty gnarly.
Materials, equipment and technologies
I have a fairly basic digital camera
and an iPod Touch – which work. My computer and software are up to
date.
The delivery and output requirements
I was able to upload my PNG files
(often considered acceptable for upload and printing) though they can
be a bit small for some print jobs.
Safety plan
- OH&S: Wanting to get things done quickly means sitting at the computer for a long time, but I have taken breaks when needed.
- Ethics: unless I have been told otherwise, I presume I've complied with all legal and ethical obligations like Copyright, correctly attributing others' work or cultural sensitivity.
Comments
Post a Comment
Thank you for your feedback. The moderator will soon moderate your comments and say 'yay' or 'nay'. Any posts that aren't relevant to the topic of this blog will be rejected immediately.